Under. The drip edge goes over the facia, under the roofing.
KrazyKyngeKorny (Krazy, not stupid)
On Mon, Apr 2, 2012 at 9:29 AM, Michael Baldwin <mbaldwin577@gmail.com> wrote:
I am rebuilding the eaves on part of my house. They were done wrong, and I have rotten wood to replace. I am going to use a 2x6 for a sub fascia board, it will be covered with vinyl or aluminum in the near future. Does the 2x6 go under the roof sheathing, or does it go next to it. A little lower to prevent it from being higher then the sheathing. I will then cover with drip edge, ice/water shield, and shingles.Thanks,Michael
__._,_.___
Please send decorating questions to Interior Motives List - to subscribe send an email to: Interior_Motives-subscribe@yahoogroups.com
.
__,_._,___
No comments:
Post a Comment